This is what the inside of our building looked like before we began work. Previously
it was an armored-car warehouse. |

Installing new drain lines. |

Grading the pad under the brewhouse. |

These guys are trying to open a door to the vault -- now our cooler. This was the
coin vault for the armored-car guys -- it's 12" thick reinforced concrete. |

The brewing equipment arrives on 3 flatbed trucks. The first time we saw these
trucks it felt like Christmas morning! |

This is David Bell, our installer from JVNW.
He oversaw placement and installation of the equipment. (And did a damn fine
job!) |

Tipping the tanks upright, prior to final placement. |

"Hey, I've got an idea. Let's build a brewery!" |
|
|